Properties

Please see our list of available properties below. Click on the link to view each property’s detailed PDF brochure. If you don’t see a property you’re looking for, please call or email us: 615.377.0909 or info@proventure.com

Buildings 1 and 2

100,000 SF - 492,000 SF
1001 Hixson Boulevard
Lebanon TN 37090
  • Contact
  • Doug McDowell
  • Jeb Atkinson
615-377-0909
  • Key features
  • Completion Date: Q1 2023
  • Building 1: 290,860 SF (Cross Dock)
  • Building 2: 201,072 SF (Rear Load)
  • 36' Clear Height
  • High Bay LED Lighting
  • 254 Trailer Stalls / 413 Car Parks
Download PDF

Parkway Place

844,480 SF
2120 Logistics Way
Murfreesboro TN 37127
  • Contact
  • Mike Brandon
  • Jeb Atkinson
615.377.0909
  • Key features
  • Under construction; available August 2022
  • Parkway Place Website
  • 40' clear height, Class A cross-dock building
  • Fronts I-24 with excellent visibility
  • 153 dock doors with ability to add more
  • 186 trailer / 596+ auto parking spaces
Download PDF

Airport Business Park 4

376,950 SF Available
200 Threet Industrial Road
Smyrna TN 37167
  • Contact
  • Brian Camp
615.221.6630
  • Key features
  • 36' Clear Height
  • 185' Truck Court
  • Office Suite - Finish-to-Suit
  • 64 - 9' x 10' dock doors
  • Rear load configuration
Download PDF

7650 Eastgate Boulevard

217,080 SF
7650 Eastgate Boulevard
Lebanon TN 37122
  • Contact
  • Mike Brandon
  • Jess Andrews
615.377.0909
  • Key features
  • Under Construction; Available July 2022
  • Class A, front load building
  • 32' clear height
  • Excellent Interstate visibility with branding opportunity
  • 34 dock positions with 2 drive-in doors
  • 265' building depth
Download PDF

Speedway Industrial Park

100,000 SF - 2,000,000 SF
1000 Darrell Waltrip Drive
Lebanon TN 37090
  • Contact
  • Mike Brandon
  • Brian Camp
  • Jess Andrews
615.377.0909
  • Key features
  • 1,400 acres with development potential of 14M SF
  • Significant utility and transportation infrastructure in place
  • Excellent location from which to draw labor
  • 1 MSF global user in-place (construction completed ahead of schedule)
  • Speedway Industrial Park Website
Download PDF